Duchesne County Recycles Demolished Materials on Bridge Project

by | Jul 14, 2021 | News | 0 comments

The Starvation Bridge construction project is moving along and safety is top priority. UDOT reports that to prevent damage to the environmental surroundings and water below, all construction debris is being collected into containers and disposed of offsite. The team is making every effort to prevent any material from falling into the water below. The Publication ‘Construction Equipment Guide’ reported on the Starvation Bridge project, sharing that Duchesne County is recycling the demolished concrete for use as road base throughout the county. The Starvation Bridge project is expected to be finished this Fall. To keep up to date on the project, visit www.utot.gov/go/us40starvationbridge


Pin It on Pinterest

Share This